All Projects

MAINTENANCE & SUPPORT

Maintenance & Support is one of our major sectors.  For several projects, we have long or short lasting periods (1-15 years) of Preventive & Corrective Maintenance Contracts.  These are operated within strict time limits and offering high standards of service.

NEW NICOSIA GENERAL HOSPITAL
CONFERENCE CENTER & FILOXENIA
PRESIDENTIAL PALACE
DEPARTMENT OF URBAN PLANNING
THEATER THOK
METROLOGY DEPARTMENT
DEPARTMENT OF WATER DEVELOPMENT
WARGAMING HQ
LIDL STORES & WAREHOUSES – ISLAND WIDE
ELECTRICITY AUTHORITY CYPRUS – DATA CENTER
LAIKO COSMOS FACTORY
KING AVENUE MALL – PAPHOS
EAC/DATA CENTRE
KARAISKAKIO FOUNDATION
UCLAN UNIVERSITY
LEVENTIS ART GALLERY
EMAK KOFINOU
X RAY MACHINE AT POLICE STATION
PAPHOS POLICE DEPARTMENT
FAMAGUSTA POLICE DEPARTMENT
KEDYPES OFFICES
EAC GENERATOR
HUB OF ENTREPRENEURSHIP AND INNOVATION OF NICOSIA
ATHIENOU MEDICAL CENTER
MARI FIRE DEPARTMENT STATION
KYPEROUNTA PULMONOLOGY CLINIC
FAMILY COURTS BUILDING
REFUGEE CENTRE -POURNARA
NICOSIA MALL
PARKLANE HOTEL
MINISTRY OF DEFENSE
QATAR EMBASSY
LARNACA GENERAL HOSPITAL
STASIKRATOUS – EVAGOROU – MAKARIOU ROAD DEVELOPMENT
PLATONAS MEDICAL CENTER
OPERATION ROOMS – OPHTHALMOLOGY OF MAKARIO HOSPITAL
NEW INTENSIVE CARE UNIT

UNDER CONSTRUCTION

CYPRUS PLANETARIUM – NICOSIA
BLU MARINE RESIDENCE AND OFFICES-LIMASSOL
LAND REGISTRY DEPARTMENT-NICOSIA
CASINO TRAINING CENTRE – LIMASSOL
DREAM TOWER – LIMASSOL
LANDMARK TOWERS (EX HILTON)
ARARAT – LIMASSOL
EL-GRECO MEDICAL CENTRE – NICOSIA
WYNDHAM HOTEL-NICOSIA
OLYMPIC & MUNICIPAL SWIMMING POOLS – NICOSIA
LIDL HYPERMARKETS – ISLAND WIDE
TRAFFIC LAW ENFORCEMENT CAMERA SYSTEMS (TLECS)
POLYTECHNIC SCHOOL – UNIVERSITY OF CYPRUS
BIOLOGY DEPARTMENT – UNIVERSITY OF CYPRUS
MEDICAL SCHOOL – UNIVERSITY OF CYPRUS
MUNICIPAL MARKET OF NICOSIA
UPGRADE OF PUBLIC WORKS DEPARTMENT
NICOSIA CENTRE BUILDING
NEW ADMINISTRATION BUILDING AT THE PRESIDENTIAL OFFICE
ALASIA RESIDENCE – NICOSIA
COMMUNITY BUILDING OF KALO CHORIOU ORINIS
EVAGOROU APARTMENT BUILDING
ADAMANTIA 59 APARTMENT BUILDING
ADAMANTIA 60 APARTMENT BUILDING
PARK VIEW COURT
7 APARTMENT BUILDINGS AT AG. MAMAS
CALIBRE PROPERTIES – APARTMENT BUILDING
APARTMENT BUILDING PANICOS HADJIIOANOU
CYFIELD CH 128
OFFICES OF COMMISSIONERS
CHAPO VICTOR
CHAPO CHRISBUR
NATASAS PILIDOU RESIDENCE
CYFIELD CH 131
PLATONAS CLINIC EXTENSION 4TH & 5TH FLOOR
LAKATAMIA MILITARY CAMP
S.A.K. GLOBAL
KALAVASSOS MILITARY CAMP
KITION TOWER
SKARINOU APIARIES
MAJESTIC 2 (DEX-TEK)
PROTARA’S MARINA DEVELOPMENT
Q2 QUALITY GROUP
AURAI PANIOTIS – PAFILIA
ARIA AY. TYCHONAS PLOT 5-13 + 1-5
KYPEROUNTA’S MUNICIPAL CENTER
VASOS MARKIDES RESIDENCE 180
PAFILIA PLOT 250 VIDA
TOWER 55
TROODOS OBSERVATORY – AGRIDIA
AGROS’ ATHLETIC CENTER
ERAZE APARTMENT BUILDING
LAMA HOUSE
NICOLAOU BUSINES CENTER SUPERMARKET
NICOLAOU BUSINES CENTER APOTHIKES
IVAN STOSANOVIC
ANDREAS KADROS APARTMENT BUILDING
ZAKAKI PLAY GROUND – CASINO
VILLA T7 LIMASSOL
GARDEN SQUARE – LUXURY HOUSING DEVELOPMENT
KOULLA & NIKOLA’S NIKOLAOU APARTMENT BUILDING
MALOUPAS & PAPACOSTAS RESIDENCES
KRANOS OFFICES
TRAINING CENTER – CASINO
NEPHROLOGY CLINIC – NEMESOS
VILLA LUNA
SUNSET (ZAVOS)
POSIDON HOUSING DEVELOPMENT
SYCHEM OFFICES
TEPAK – RENOVATION & EXTENSION DEVELOPMENT
ART TALE APARTMENT BUILDING
THE ISLAND PRIVATE SCHOOL
BOUTIQUE BEVERAGES BOTLING INTERNATIONAL
TENNIS ACADEMY
AMAYA – 3 APARTMENT BUILDINGS
BLOOD PURIFICATION AT PAPHOS HOSPITAL
AMERICAN UNIVERSITY BEIRUT
LIOPETRY RIVER DEVELOPMENT
PUBLIC KINDERGARΤEN ΙΝ ΑΥΙΑ NAPA

COMPLETED

• New Nicosia General Hospital 
Architects: Kyriakides – Fereos – Kyriakides
Consultant: N.E Aristodemou
Contract Amount: US$ 15,000,000
Duration: 1998-2005

 Nicosia Mall
Architects: Christoforos A. Meletiou + Associates, Architect Engineers – Theofilos Afxentiou
Consultants: MELTEC
Duration: 2017-2018

• Kings Avenue Mall
Architects: Theofilos Afxentiou
Duration: 2012-2014

METROPOLIS MALL-LARNACA

• AMARA HOTEL – LIMASSOL
Consultant: SKP, Sotiriou, Kyrizis Partners
Architect: S.B. Architects
Duration:2016-2018

• PARK LANE HOTEL (EX-LE MERIDIEN)

• University Library Stelios Ioannou
Architects: J&A Philippou Architects Engineers
Consultant: Eliofotou & Zinieris Meltec, Mitsides, Samuel & Associates Building Services Consultants

• DEL-MAR TOWER-LIMASSOL
• HUB OF ENTREPRENEURSHIP AND INNOVATION OF NICOSIA
• Wargaming Group – Various Buildings
• LABS TOWER – NICOSIA
• BEDIZIA TOWER – NICOSIA
• NICOSIA MUNICIPALITY “Β4”
• BEEKEEPING PERISTERPONAS PHASE Β
• ESPERIDES
• LIDL TSERIOU
• LIDL H/Q PV SYSTEM
• SUNRISE PROJECT (BRITISH MILITARY BASES)

• Wargaming Headquarters and other buildings
Architects: Alexandros Livadas
Consultant: MELTEC
Duration: 2012-2015

• Coop – Data Centre
Architects: Andreas Vasileiou
Consultant: Andreas Soteriou
Duration: 2012-2017

• 3CX Bulding H/Q
Architects: SEROFF & PAPADOPOULOS
Consultant: E-PLAN ELECTRICAL CONSULTANTS
Duration: 2016-2018

• Unit Integrated Plant Management of Cyprus Solid Household Waste (Oeda)
Duration: 2015-2018
Consultant: Hyproment 

• University of Cyprus
– Faculty of social science and education
– Faculty of engineering
– Faculty of letters
– Faculty of humanities
– Sport facilities
– Faculty of pure and applies sciences

Architects: Ch. Chrysanthou & Papachristou Architects
Duration: 2005-2008

• Medical School of University of Cyprus
Consultant: N. Aristodemou 

• UClan University
Architects: G. Lissiotis & G. Mourouzides
Duration: 2013-2015

• Unihalls & Mall for Rotos
Architects: Eraclis Papachristou
Consultant: MELTEC
Duration: 2013-2014

• London Road/3 ACE (UK)
Architect: J.S.M Associates London
Duration:2015-2016

• Chubb House/ 3 ACE (UK)
Architect: J.S.M Associates London
Duration:2015-2016

• Esperides
Architects: J&A Philippou Architects Engineers
Consultant: Numech
Duration: 2011-2016

• Wind Turbine of University of Cyprus

• Wind Turbine Ayia Anna
Architects: Eraclis Papachristou

• Cine Theatre Pallas
Architects: PAG Architects & Engineers
Duration: 2007-2008

• Paphos Seafront
Architect: Polizia Armos –Mesaritis Pelekanos
Duration:2010-2010

• Almyra Hotel – Renovation (Paphos)
Architect: Agathi Kleanthous Mpellou
Duration:2003-2004

• Alpha TV Station
Consultant: N. Aristodemou
Architect: N. Shiacalis
Duration: 2016-2017

• Crown Resorts Hotel
Architect: J&A Philippou Architects Engineers
Duration:2001-2002

• Societe General Bank
Consultant: L. Vakanas
Duration:2016-2017

• Restoration of the Holy Monastery of Apostolos Andreas – Phase A
Consultant: Onoufrios Monoyiou
Architect: D. M. Myrianthefs
Duration:2015-2016

• EAC / Data Centre
Consultant: EAC
Architect: EAC
Duration:2002-2002

• Cultural Events Hall in Pervolia
Consultant: Akritas
Architects: D.Michael & Associates
Duration: 2015-2016

• Faros Sea Residence / JV A.E. & Telmen
Architects: J&A Philippou Architects Engineers
Consultant: UNEMEC
Duration: 1999-2016

• Passengers Waiting Area – Limassol Port
Architects: Irwin & Kritioti Architecture
Consultant: MELTEC
Duration: 2012-2015

• Renovation of Traditional Building at Vouni
Consultant: Georgiou, Zembylas Partners
Architects: Kythreotis Architecture
Duration: 2013-2016

• LIDL Ypsonas
Consultant: Samaras Demetris
Duration: 2014-2016

• Multipurpose Hall and City Library in the Municipality of Peyia
Consultant: Doublen
Architects: Loukaedes & Philippou
Duration: 2016-2017

• Konstantinoupoleos Secondary School – Strovolos
Consultant: Ministry of Education
Year of completion: 2015-2015 

• New Building Construction for EMAK at Kofinou
Consultant: N. Katsaris
Year of completion: 2014-2015 

• Waste Water Treatment Plant
Consultant: SKP Soteriou, Kyrizis Partners
Architects: Demetrios Constantinou & Associates
Year of completion: 2013-2015 

• Recycled Water Storage Tank
Consultant: GEMAC
Year of completion: 2015 

• Limassol Gardens
Consultant: AK Andreou Adv.
Architects: George Paroutis Architecture
Year of completion: 2013-2015 

• Quality Group – Kalavassos Houses
Architects: Savvas Kakos & Associates
Duration: 2008-2009 

• Multifunctional Seaside Park – Rehabilitation of the City Center at Limassol
Consultant: Josephides & Associates
Duration: 2013-2015 

• Industrial Building in Ypsonas
Consultant: Chari Cons.
Architects: Christos Christou
Duration: 2013- 2015 

• 5th Primary & Nursery School – Paphos
Consultant: Ministry of Education
Duration: 2014- 2015 

• Reconstruction of the Community Square in Inia Akamas Region
Consultant: Josephides
Architects: Pefkios Georgiades
Duration: 2009 -2015 

• Private Hospital Aretaieio-Extension
Architects: Doma office of Architects
Consultant: MELTEC
Duration:2003-2006

• Block of Offices – Flavia
Architects: Elena Constantinidou
Consultant: Gemac 

• New Passenger Terminal
Architects: Republic of Cyprus
Duration: 2012-2015

• A. G. Leventis Art Gallery
Architects: J&A Philippou Architects Engineers
Consultant: GEMAC
Duration: 2011-2014 

• Strovolos Library
Architects: Christos Panayiotides
Consultant: Zenith Consulting Engineers
Duration: 20010-2012

• Falcon School
Architects: J. Joseph.
Consultant: Eliofotou & Zinieris Meltec
Duration: 2012-2013

• Office Building – FBME Bank Ltd
Architects: Zembylas & Partners Architectures
Consultant: Gemac
Duration: 2009-2009

• Showroom Ch. & P. Maouris Co. Ltd
Architects: Kallia Nocolaou Tappa
Consultant: Neophytos Avraamides
Duration: 2011-2012

• Spiritual Centre of St. Nektarios A Filithei
Architects: Simpraxis
Consultant: AGS Electroproject Ltd
Duration: 2013-2013

• P. Papavarnavas & Sons Ltd at Strovolos
Architects: Petevis & Georgiades Partners
Consultant: UNEMEC
Duration: 2014-2015

• Port Road Road AT Limassol / Cables 11KV
Architects: EAC
Consultant: EAC 

• Limassol Old Port
Architects: Chrysathou & Partners
Consultant: Mitsides, Samuel & Associates Building Services Consultants
Duration: 2012-2015

• Limassol Seafront Park
Architects: Josephides and Associates
Consultant: Josephides and Associates
Duration: 2005-2006

• Tasos Papadopoulos – TEPAK
Architects: TEPAK
Consultant: TEPAK
Duration: 2010-2011

• East Land – TEPAK
Architects: TEPAK
Consultant: TEPAK
Duration: 2011-2011

• Stoa Laniti – TEPAK
Architects: TEPAK
Consultant: TEPAK
Duration: 2012-2013

• Porto Paphos Residence
Architects: J&A Philippou Architects Engineers
Consultant: Eliofotou & Zinieris Meltec
Duration: 2013-2015

• Meterology Building
Architects: Nicolaou Andreas Partnership  Architects & Designers
Consultant: SKP  Soteriou, Kyrizis Partners
Duration: 2013-2014

• Akropolis High School
Architects: Vasilis Ierides
Consultant: SKP  Soteriou, Kyrizis Partners
Duration:2013-2015

• New Headquarters CypriaLife – Nicosia
Architects: Nicolaou Andreas Partnership  Architects & Designers
Consultant: Georgiou & Zembylas Partners
Duration:2013-2015

• Lidl Supermarket (17 shops)
Architects: LIDL Cyprus
Consultant: Σαμαράς & Συνεργάτες
Duration: 2007-2018

• Smalto
Architects: Giorgos Xatzixristou
Consultant: Ch. Meleties
Duration:2015-2018

• Piraeus Banks (14 Shops)
Architects: Athos Dikaios Associates
Consultant: Meleties &Partnerships
Duration: 2005-2009

 Satiriko Theatre Vladimiros Kafkaridis
Architects: Marios & Olyvia Chourti
Consultant: MECONE
Duration:2012-2013

• Limassol Court – Parking
Architects: George Mavromatis & Associates
Consultant: SKP Soteriou, Kyrizis Partners 

• Protaras Sidewalks
Architects: Pefkios Georgiades
Consultant: Josephides and Associates 

• My Mall Shopping Mall at Limassol
Architects: George Mavromatis
Consultant: SKP Soteriou, Kyrizis Partners
Duration: 2008-2009

• Chapo Central
Architects: Photis Economides – Jane Mitchell Chartered Architects
Consultant: A. Eracleous Electrical Installations
Duration: 2006-2012

• Desalination Plants in kouklia
Architects: George Kolonias
Consultant: Charis Consulting Engineers
Duration: 2002-2003

 Laiko Group Building
Architects: Michael Michael Architects
Consultant: SKP Soteriou, Kyrizis Partners
Duration: 2009-2010

• Faculty of Economics and Management
Architects: J&A Philippou Architects Engineers
Consultant: GEMAC
Duration: 2006-2010

• Army Camp in Kornos
Architects: Public Works Department
Consultant: EMS 

• Paphos Town Hall
Architects: Philios Charalambides
Consultant: UNEMEC 

• Dialysis Hospital at N.N.G.H.
Consultant: N. Aristodemou

• Rochester Project – London
Architects: The Kalyvides Partnership Arhitects and Urban Designers
Consultant: N.E. Aristodimou

• Presidential Hall
Architects: Andreas Nicolaou Partnership
Duration: 2011-2012

• Water Development Department
Architects: A. Gavrielides Architect Engineers
Duration: 2007-2008

• Oncology Center at Nicosia
Architects: J&A Philippou Architects Engineers
Consultant: GEMAC
Duration:1997-1999

• Ammunition Depots in Nicosia – Phase A’
Architects: Public Works Department
Consultant: EMS 

• Nicolaou Business Centre
Architects: Miltos Papadopoulos and Associates
Consultant: Charis Consulting Engineers 

• Renovation of Classic Hotel
Architects: J&A Philippou Architects Engineers
Consultant: Georgiou & Zembylas Partners 

• Tasos Georgiou Eye Clinic
Architects: Ch. Feraios & Partnerships
Consultant: N.E. Aristodimou
Duration: 2009-2011

• GCC Computers
Architects: Vatiliotis & Vatiliotou Consulting Services Ltd
Consultant: Eldom Engineering Consultant Ltd 

• Fishing Shelter at Zygi
Architects: Dion. Toumazis & Associates
Consultant: A. Mouzouras Associates

• Natura Beach Hotel
Architects: Santama Brothers
Consultant: N.E. Aristodimou

• Women’s Prison Unit
Architects: EMS
Consultant: EMS 

• CYTA – Structured Cabling for 69 Secondary Schools
Architects: CYTA
Consultant: CYTA

• Restoration of Old Town Hall – Nicosia
Consultant: Nicosia Municipality 

• Information Centre at Kalopanayiotis
Consultant: AK Andreou Advanced Engineering

 Photovoltaic Parks
Duration: 2014-2014

• A’ Primary School at Agios Dometios
Architects: Vasilis Vasileiou
Consultant: Akritas Consulting Engineer

• Streetlighting at GSP interchange
Architects: Ministry of Transports  and Works
Consultant: EMS
Duration: 2010-2012

• Cable Pulling of 132kV – All over Cyprus
Architects: EAC
Consultant: EAC
Duration: 2004

• Helicopter Hangar at Larnaca Airport
Architects: Nicolaou Andreas Partnership Architects & Designers
Consultant: SKP Soteriou, Kyrizis Partners

• Municipal Market Saint Antoniou
Architects: Nayia Savidou & Elena Papamichael
Consultant: GEMAC
Duration: 2010-2011

• Medical School – University of Nicosia
Architects: J&A Philippou Architects Engineers
Consultant: A. Mouzouras Associates
Duration: 2011-2016

• EDEN Beach Hotel
Architects: Akis Charalambous Partnerships
Consultant: Elemec Engineering Consultant
Duration: 2010-2012

• Illegal Immigrants Detention Building at Menogeia
Architects: EMS
Consultant: EMS 

• Ag. Spyridonas Cemetary
Architects: Mesarites Pelekanos (Polytia Armos)
Consultant: Josephides and Associates 

• High School of Kykkos A’
Architects: J&A Philippou Architects Engineers
Consultant: J&A Philippou Architects Engineers

• High School West of Limassol
Architects: Petevis & Georgiades
Consultant: UNEMEC 

• Natuzzi Showroom
Architects: Christos Pavlou
Consultant: N.E. Aristodimou 

• High School in Paralimni
Architects: Tefkros Aggelides
Consultant: Charis Consulting Engineers 

• Kannaviou Dam
Architects: Mesogeios A.E.
Consultant: Mesogeios A.E. 

• Rodaphnousa – Home in Latsia
Architects: Miltos Papadopoulos & Associates
Consultant: Charis Consulting Engineers

• Baker / Till/ Klitou Offices
Architects: Margolis Office Environments
Consultant: Charis Consulting Engineers 

• Sunwing Hotel (Ayia Napa)
Architects: Nickolas Meletiou in Association with Kostas Kadis
Consultant: Eliofotou & Zinieris Meltec
Duration: 2012-2017

• Theatrical Organization of Cyprus (THOK)
Architects: D. Kythreotis & Partners
Consultant: UNEMEC
Duration: 2009-2014

• S.G Investment in Egomi
Architects: Mesaritis Pelekanos
Consultant: Josephides and Associates 

• Printco
Architects: Michael Michael
Consultant: SKP Soteriou, Kyrizis Partners 

• Cyprus – French School – ATI
Architects: I. Pelekanou
Consultant: Ministry Of Educations

• Alpaco Showroom
Architects:
Consultant:

• ELA
Architects: Tsiakkas Kyriacos
Consultant: Tsiftes 

• Multi Purpose Center Pelentri
Architects: Giannakis Skordis
Consultant: Zenith Consulting Engineers 

• Pharos Tower – Limassol
Architects: P. Pantelides & Associates
Consultant: Christos Christofi 

• Vasillikos Phase 1 & 2
Architects: EAC
Consultant: EAC

• Reformation Traditional Core In Polemidia
Architects: EMS
Consultant: EMS 

• Polemidia Road – Cables 11KV
Architects: EAC
Consultant: EAC 

• Winery Sodap – Stroubi
Architects: Chrysostomos Italos
Consultant: Charis Consulting Engineers 

• EAC Warehouses at Paphos
Architects: A. F. Modinos + S.A. Vrahimis
Consultant: SKP Soteriou, Kyrizis Partners

• Limassol Marina – Blocks 1-9
Architects: A. F. Modinos + S.A. Vrahimis
Consultant: GEMAC 

• Paphos Technical School
Architects: Mesaritis Pelekanos
Consultant: Josephides and Associates

• 24 Schools – Ministry of Educations
Architects: Ministry Of Education
Consultant: Akritas Consulting Engineers 

• INTERNATIONAL CONFERENCE CENTRE
Architects: Andreas Constantinou & Associates and Scott Browning Architects
Consultant: UNEMEC (Electrical Consultants)
Duration: 2002-2005

• NEW NICOSIA TOWN HALL
Architects: Irwin + Kritioti Architecture
Consultant: MELTEC – Eliofotou, Zinieris & Stasis Partners 

• Military Army Camp Phase Β’
Architects: Antoniadou – Maurokordatos- Giorgalla- Allapotis
Consultant: Christakis Meleties – Electrical Engineer

• Central Prison – Extension of the open prison
Architects: EMS
Consultant: EMS 

• PREFAB OFFICE AT LIMASSOL PORT
Architects: Archiplus
Consultant: Cyprus Ports Authority 

• AMERICAN ACADEMY – PAPHOS
Architects: SDP Architectural & Technical Office
Consultant: MECONE – Electrical Engineer 

• KARAISKAKION FUNDATION BUILDING – NICOSIA
Architects: Miltos Papadopoulos – Associated Architects Engin.
Consultant: Chari Consulting Engineers Ltd 

• APOLLONIO PRIVATE HOSPITAL – STROVOLOS. EXTENSION OF EXISTING BUILDING AND PARKING
Architects: Theodoros Kyriakides
Consultant: MELTEC – Eliofotou, Zinieris & Stasis Partners
Duration: 2007-2010

• NEW HEAD OFFICE OF THE DEPARTMENT OF TOWN PLANNING
Architects: Ioakeim – Loizas
Consultant: Georgiou Zambylas Partners
Duration: 2003-2007

• NICOLAOU BUSINESS
Architects: Miltos Nicolaou Associates Architects – Engineers
Consultant: Chari Consulting Engineers Ltd

• UNIVERSITY OF CYPRUS – SCHOOL OF FINANCE AND BUSINESS ADMINISTRATION
Architects: Ch. Chrysanthou & E. Papachristou Architects
Consultant: Mitsides Samouel & Associates 

• FISHING REFUGE IN ZIGI
Architects: D. Toumazis & Associates
Consultant: A. Mouzouras & Associates 

• TRAFFICKING OF ILLEGAL IMMIGRANTS BUILDING – MENOGIA
Architects: EMS
Consultant: EMS

• PAPHOS MILITARY AIR BASE – PHASE C’
Architects: Petevis & Georgiades
Consultant: HITECO

• 3066 – A KALAVASOS – TRADITIONAL VILLAGE
Architects: Savvas Kakos & Associates Architects & Engineers
Consultant: Marios Agrotis – Electrical Engineer

• CHAPO – OLGA APPARTMENT BLOCK
Architects: Aristos Christodoulides
Consultant: MELTEC – Eliofotou, Zinieris & Stasis Partners 

• LYCEUM – WEST OF LIMASSOL
Architects: Petevis & Georgiades Associates
Consultant: UNEMEC (Electrical Consultants) 

• 3065 ENALIA BEACH (Residences)
Architects: Savvas Kakos & Associates Architects & Engineers
Consultant: Doublen Consulting Engineers Ltd 

• NIOVIS SATANA RESIDENCE (NICOSIA)
Architects: Anastasia Pitta
Consultant: Zenith – Electrical Engineering Consultants 

• A’ ELEMENTARY SCHOOL AGIOU DOMETIOU
Architects: Vasilis Vasiliou
Consultant: Akritas Consult. Engineers 

• PARALIMNIOU LYCEUM
Architects: Tefkros Aggelides
Consultant: Chari Consulting Engineers Ltd 

• KYKKOU A’ LYCEUM
Architects: J&A Philippou Architects Engineers
Consultant: J&A Philippou Architects Engineers

• “EVANIKIS” APPARTMENT BLOCK (KAIMAKLI)
Architects: Epitessera Architects
Consultant: Epitessera Architects 

• “HOME PRO 1” APPARTMENTS IN LIKAVITOS
Architects: Giorgos Konstantinides – Civil Engineer
Consultant: Soteriou, Kyrizis Partners Ltd M&E Consulting Engineers 

• MR & MRS KARATSIA’S RESIDENCE
Architects: Cyfield Development Co Ltd
Consultant: Chari – Consulting Engineers 

• LEFKI SILVESTROU’S LISTED BUILDING (LEFKARA)
Architects: Maria Mavrou – Architectual Studio
Consultant: MECONE, Mechan. Electr & Energy Consultants and Engineers 

• APHRODITE HILLS RESIDENCE
Architects: Vafeades & Co
Consultant: Nicolas E. Aristodemou – Mech. & Energy Consultants and Engineers 

• APHRODITE HILLS – INTERCONTINENTAL HOTEL
Architects: J&A Philippou Architects Engineers
Consultant: GEMAC
Contract Amount: US$ 3,100,000
Duration: 2002-2004

• NEW FAMAGUSTA GENERAL HOSPITAL
Architects: K. Kyriakides & M. Zanettos
Consultant: N. Aristodemou
Contract Amount: US$ 2,241,772
Duration: 2002-2005

• POLYCLINIC YGIA AT LIMASSOL
Architects: J&A Philippou Architects Engineers Consultant: GEMAC
Contract Amount: US$ 1,350,400
Duration: 2003-2006

• STROVOLOS MUNICIPALITY – THEATRE
Architects: Ioakim Loizias
Consultant: Josefides & Associates
Contract Amount: US$ 1,350,000
Duration:2004

• ALDIANA – ALAMINOS
Architects: G. Th. Mavromatis & Associates
Consultant: UNEMEC
Contract Amount: US$ 1,132,293
Duration: 2002-2004

• NEW GOVERNMENT BUILDING – PAPHOS
Architects: Public Work Department
Consultant: Nicolas E. Aristodemou
Contract Amount: US$ 1,097,096
Duration:2003-2006

• NEW K.E.N. – PAPHOS
Architects: TEXYA
Consultant: UNEMEC
Contract Amount: US$ 809,075
Year of commencement: 2001
Year of completion: 2004

• SUPREME COURT – NICOSIA
Architects: Alexandros Levadias
Consultant: GEMAC
Contract Amount: US$ 543,838
Duration:2002-2004

• POLEMIDIA AND LIMASSOL PORT ROUNDABOUT
Architects: EMS
Consultant: EMS
Contract Amount: US$ 398,093
Year of commencement: 2003
Year of completion: 2004 

• PORSCHE CENTRE
Architects: A. Gabrielides
Consultant: Nicolas E. Aristodemou
Contract Amount: US$ 181,460
Year of commencement: 2003
Year of completion: 2004 

• ANASSA HOTEL – POLIS
Architects: A. Gavrielides Architect Engineers
Consultant: Gemac
Contract Amount: US$ 3,046,908
Duration: 1996-1998

• NEW GOVERNMENT BUILDING – NICOSIA
Architects: J&A Philippou Architects Engineers
Consultant: Gemac
Contract Amount: US$ 2,534,720
Duration:1998-2000

• INTERNATIONAL MERCHANDASING CENTRE (IMC)
Architects: Petevis & Georgiades
Consultant: Gemac
Contract Amount: US$ 1,517,611
Year of commencement: 1995
Year of completion: 1996 

• NEW STADIUM GSP
Architects: KAL Engineering
Consultant: A. Mouzouras & Associates
Contract Amount: US$ 1,441,561
Duration: 1997-1999

• LIMASSOL – PAPHOS HIGHWAY TUNNEL LIGHTING
Architects: EMS
Consultant: EMS
Contract Amount: US$ 1,312,110
Duration: 1996-1997

• 120 FAMILY SOLDIERS QUARTERS – EPISKOPI
Architects: Gifford & Kalisperas
Consultant: Gifford & Kalisperas
Contract Amount: US$ 1,041,642
Year of commencement: 1998
Year of completion: 2000 

• MILITARY CAMP – MATHIATIS
Architects: TEXYA
Consultant: Gemac
Contract Amount: US$ 842,673
Year of commencement: 2000
Year of completion: 200
1

• NEW MILITARY CAMP – KLIROU
Architects: C.M.P
Consultant: Gemac
Contract Amount: US$ 929,495
Year of commencement: 1993
Year of completion: 1995 

• NEW FAMILY QUARTERS RAF – AKROTIRI
Architects: Gifford & Kalisperas
Consultant: Gifford & Kalisperas
Contract Amount: US$ 659,096
Duration: 2001-2002

• AVANTI HOTEL
Architects: Ch. Palas
Consultant: MELTEC
Contract Amount: US$ 577,907
Year of commencement: 1992

Year of completion: 1994 

• NEW OFFICES OF THE PUBLIC WORKS DEPARTMENT – NICOSIA
Architects: Public Works Department
Consultant: E.M.S.
Contract Amount: US$ 520,179
Duration: 1994-1996

• NAVAL BASE – MARI
Architects: Minas Zannetos
Consultant: Akritas Consulting Engineers
Contract Amount: US$ 462,685
Duration: 2001-2003

• MILITARY CAMP FRENAROS
Architects: Maratheftis & Yiannouris
Consultant: MELTEC
Contract Amount: US$ 452,917
Duration: 2000-2002

• MILITARY CAMP – LEFKARA
Architects: TEXYA
Consultant: A. Mouzouras & Associates
Contract Amount: US$ 405,598
Duration:2000-2001

• LAIKI LIMASSOL
Architects: Tiritas & Tiritas
Consultant: Aspello Consulting
Contract Amount: US$ 1,517,611
Duration: 2000-2001

• PARALIMNI STADIUM
Architects: SANTAMA Brothers
Consultant: L. Josephides
Contract Amount: US$ 314,338
Year of commencement: 1995
Year of completion: 1996

• AYIA NAPA MUNICIPALITY CULTURAL CENTRE
Architects: Z. Sierepeklis
Consultant: Aletraris & Associates
Contract Amount: US$ 308,322
Duration: 2001-2003

• ELA MARIS HOTEL APPARTMENTS
Architects: Ch. Thrasou
Consultant: SAPCO
Contract Amount: US$ 304,198
Duration: 1987-1989

• PLAKA HOTEL APPARTMENTS
Architects: M. Stylianou
Consultant: Hiteco
Contract Amount: US$ 304,198
Year of commencement: 1991
Year of completion: 1994 

• UNIVERSITY OF CYPRUS – HALLS OF RESIDENCE
Architects: University of Cyprus
Consultant: University of Cyprus
Contract Amount: US$ 302,508
Duration: 2000-2001

• ASSIOTIS HOME PLAZA
Architects: Thrasou Bros
Consultant: SAPCO
Contract Amount: US$ 287,298
Year of commencement: 1994
Year of completion: 1996

• STUDENT CAMPUS
Architects: University of Cyprus
Consultant: University of Cyprus
Contract Amount: US$ 282,059
Duration: 2000-2001

• SEWAGE SYSTEM UPGRADE – EPISKOPI GARISSON
Architects: Gifford & Kalisperas
Consultant: Gifford & Kalisperas
Contract Amount: US$ 281,848
Duration: 2000-2000

• EAC 132KUA XLPE CABLE
Architects: E.A.C
Consultant: E.A.C
Contract Amount: US$ 273,778
Duration: 1996- 1996

• N & A HOTELS LTD – CORAL BAY
Architects: Petevis & Georgiades
Consultant: Akritas Consulting Engineers
Contract Amount: US$ 270,480
Duration: 2001-2002

• PRESIDENTIAL PALACE
Architects: E.M.S.
Consultant: E.M.S.
Contract Amount: US$ 256,686
Year of commencement: 1995
Year of completion: 1996

• Paphos Water Supply & Ezousa
Architects: Howard Humphreys & Partners
Consultant: Howard Humphreys & Partners
Contract Amount: US$ 209,768
Duration: 2000-2001

• Embassy of Egypt
Architects: Christos Mitsingas
Consultant: UNEMEC
Contract Amount: US$ 206,064
Duration: 2002-2003

• Avlida Hotel
Architects: S. Economou
Consultant: Gemac
Contract Amount: US$ 202,799
Year of commencement: 1987
Year of completion: 1989

• TY 122/97 (1999)
Architects: A. Papadopoulos
Consultant: A. Mouzouras & Associates
Contract Amount: US$ 202,799
Year of commencement: 1998
Year of completion: 1998 

• Military Camps Kornos / Mathiatis / Polemidia
Architects: N. P. Liveras
Consultant: G. Aletraris
Contract Amount: US$ 192,659
Year of commencement: 1997
Year of completion: 1997 

• Installation of 132KV Cables
Architects: EAC
Consultant: EAC
Contract Amount: US$ 185,348
Duration: 2001-2001

• Dekeleia – Famagusta Section Pyla – Xylotympou Contract 1
Architects: E.M.S
Consultant: Gemac
Contract Amount: US$ 178,801
Duration: 1999-2000

• Elias Papakyriakou Military Camp – Athalassa
Architects: N.P. Liveras
Consultant: Aletraris / ELEMEC
Contract Amount: US$ 177,448
Year of commencement: 1992
Year of completion: 1994 

• The Limassol District Law Court
Architects: G. Th. Mavromatis & Associates
Consultant: Sotiriou, Kyrizis Partners
Contract Amount: US$ 173,224
Duration: 2001-2002

Silvex House
Architects: J&A Philippou Architects Engineers
Consultant: J&A Philippou Architects Engineers
Contract Amount: US$ 168,999
Duration: 1994-1996

• Ayios Elias Village
Architects: P. Georgiades
Consultant: N. Aristodemou
Contract Amount: US$ 168,999
Year of commencement: 1987
Year of completion: 1989 

• Bank of Cyprus Cultural Foundation
Architects: J&A Philippou Architects Engineers
Consultant: Gemac
Contract Amount: US$ 164,247
Year of commencement: 1994
Year of completion: 1996 

• COOP Kaimakli
Architects: A. Mouktaris
Consultant: UNEMEC
Contract Amount: US$ 135,199
Duration: 1994-1997

• Pumping Station
Architects: Montgomery Watson & Ioannou
Consultant: Montgomery Watson & Ioannou
Contract Amount: US$ 127,535
Duration: 2000-2001

• Tennis Court KOA
Architects: SANTAMA Brothers
Consultant: Josephides & Associates
Contract Amount: US$ 126,318
Year of commencement: 1997
Year of completion: 1998 

• Dekeleia – Protaras Road No No 113/99/EMS
Architects: Lardis D. & Partners
Consultant: Gemac
Contract Amount: US$ 111,412
Duration: 2001-2001

• Galaxias Shopping Centre
Architects: A. Joanides
Consultant: Gemac
Contract Amount: US$ 109,849
Year of commencement: 1986
Year of completion: 1988

• Laiki Training Centre
Architects: Theo. David & Associates
Consultant: Nikolaides Stelios & Associates
Contract Amount: US$ 106,470
Duration: 1993-1995

• Planning Bureau
Architects: Public Works Department
Consultant: EMS
Contract Amount: US$ 101,400
Duration: 1991-1993

• Vasos Leptos Showroom
Architects: Ch. Fereos
Consultant: Gemac
Contract Amount: US$ 101,400
Year of commencement: 1989
Year of completion: 1989 

• Dekeleia – Protaras Section
Xylotympou – Ormidia / Contract 2A
Architects: EMS
Consultant: MELTEC
Contract Amount: US$ 126,318
Duration: 1999-2000

• Strovolos Interchange
Architects: EMS
Consultant: EMS
Contract Amount: US$ 90,568
Duration: 1999-2000

• Duty Free Shop – Larnaca Airport
Consultant: St. Nicolaides
Contract Amount: US$ 89,569
Duration: 1997-1997

• Anais Hotel
Architects: A. Christodoulides
Consultant: ELDOM
Contract Amount: US$ 84,500
Year of commencement: 1987
Year of completion: 1989

• Military Camp – Asgata
Architects: CMP
Consultant: CMP
Contract Amount: US$ 67,600
Year of commencement: 1987
Year of completion: 1987

• Cyprus Stock Exchange – 2nd Floor
Architects: T. Zissimou
Consultant: Gemac
Contract Amount: US$ 57,460
Duration: 1997-1997

• NAAFI – Akrotiri
Architects: ACER
Consultant: ACER
Contract Amount: US$ 52,390
Duration:1995-1995

• Alexander Barracks
Architects: ACER
Consultant: ACER
Contract Amount: US$ 50,700
Year of commencement: 1991
Year of completion: 1992

• Universal Life – Paphos
Architects: Psomas Koutsoftides & Sierepeklis
Consultant: Gemac
Contract Amount: US$ 50,700
Year of commencement: 1992
Year of completion: 1994 

• Military Camp – Larnaca (K.E.N.)
Architects: A. Gavrilides
Consultant: Mouzouras & Associates
Contract Amount: US$ 50,700
Year of commencement: 1993
Year of completion: 1994 

• Kleopatra Hotel
Architects: D. Toumazis & Associates
Consultant: ELDOM
Contract Amount: US$ 50,700
Year of commencement: 1992
Year of completion: 1994

• Parking – Ledras
Architects: Nicosia Municipality
Consultant: Mouzouras & Associates
Contract Amount: US$ 33,800
Year of commencement: 1994
Year of completion: 1995 

• Family Court and Industrial Disputes
Court – Nicosia
Architects: Public Works Department
Consultant: Public Works Department
Contract Amount: US$ 33,800
Year of commencement: 1991
Year of completion: 1992 

• Fire Station – Paphos
Architects: Public Works Department
Consultant: Public Works Department
Contract Amount: Public Works Department
Year of commencement: 1992
Year of completion: 1994

• Parking – Phaneromenis
Architects: Nicosia Municipality
Consultant: Mouzouras & Associates
Contract Amount: US$ 25,350
Year of commencement: 1992
Year of completion: 1994 

• Ministry of Education & Culture 20
Schools
Consultant: N.E Aristodemou
Contract Amount: € 1,558,439
Year of commencement: 2009
Year of completion: 2009 

• Pascal School
Architects: Chrisoforos A. Meletiou
Consultant: Mecone
Contract Amount: € 1,030,607
Duration: 2006-2008

• IT Centre Popular Bank
Architects: CMP Architects
Consultant: Meltec
Contract Amount: € 781,753
Duration: 2007-2009

• Pallas Theatre
Architects: PAG Architects-Engineers
Consultant: Meltec
Contract Amount: € 666,354
Year of commencement: 2006
Year of completion: 2007 

• Enfoto Solar
Architects: Andreas Sotiriou & Partners
Consultant: N.S.A Nicolaides
Contract Amount: 600,000
Year of commencement: 2008
Year of completion: 2009 

• Foodpax
Architects: Dorikos Architects
Consultant: Meltec
Contract Amount: 354,975
Year of commencement: 2004
Year of completion: 2007

• Mavrides Clinic
Architects: Minas Zannetos
Consultant: N.E Aristodimou
Contract Amount: 248,610
Duration: 2007-2009

• Severis Building Ltd
Architects: A.Gavrielides
Consultant: Gemac
Contract Amount: 215,283
Year of commencement: 2000
Year of completion: 2004 

• Ledra Housing Estate
Architects: Aristos Christodoulides
Consultant: A.Eracleous Electrical Installations Ltd
Contract Amount: 212,932
Duration: 2002-2006

• Fraggeskides
Architects: Sandama Bross
Consultant: N.E Aristodemou
Contract Amount: 176,602
Year of commencement: 2007
Year of completion: 2008 

• Elementary School Agiou Arseniou
Architects: Eutixios Papaeutixiou, Foivos Ianovides, Gloria E Papadouri
Consultant: Chri. Georgiades & Partners
Contract Amount: 165,155
Duration: 2005-2007

• Artemisia Business Centre
Architects: Oikonomou
Consultant: Mecone
Contract Amount: 136,688
Year of commencement: 2005
Year of completion: 2007 

• Popular Bank (H.O)
Architects: Maratheftis & Yiannouris Architects Engineers
Consultant: Meltec
Contract Amount: 99,560
Year of commencement: 2000
Year of completion: 2004 

• Luceum Palliometochou & Kokkinotrimithias
Consultant: Mitsides & Samouel Partnery
Contract Amount: 93,631
Year of commencement: 1997
Year of completion: 1998

• Lakatamia Military Base
Architects: A. Nicolaou & G Chatzigeorgiou
Consultant: Hiteco
Contract Amount: 85,430
Duration: 2007-2008

• M.G Timinis Building
Architects: A.Gavrilides
Consultant: N.E Aristodemou
Contract Amount: 73,469
Duration: 2006-2006

• Kalisperas – Proton Building
Architects: GIFFORD &KALISPERAS
Consultant: GIFFORD &KALISPERAS
Contract Amount: 60,493
Duration: 2008-2009

• Bennigan’s Restaurant
Architects: Thrasou Bros
Consultant: Acritas Consulting Engineer
Contract Amount: 54,675
Duration: 2006-2007

• GBB Lifenine
Architects: Nicos Mavronicolas Architects
Consultant: Gemac
Contract Amount: 50,569
Duration: 2005-2006

• Accountants Building
Architects: Meletiou Christophoros
Consultant: Mecone
Contract Amount: 47,273
Duration: 2007-2008

• EAC S/S District Offices
Architects: EAC
Consultant: EAC
Contract Amount: 46,255
Duration: 2005-2006

• Pita Pan Restaurant
Architects: Georgios Anastasiou
Consultant: N.E Aristodemou
Contract Amount: 38,962
Duration: 2008-2008

• Athletic Centre in Kaimakli
Architects: Theo David Arhitects
Consultant: A.Mouzouras
Contract Amount: 38,470
Duration: 2007-2008

• Peristerona Square
Architects: Demetrios Constantinou & Associates
Consultant: Meltec
Contract Amount: 37,819
Duration: 2006-2008

• Ministry of Finance-General Accounting Department
Architects: PWD
Consultant: Gemac
Contract Amount: 30,418
Duration: 2007-2008

• Wagamama Restaurant
Architects: Mourouzides Consulting Engineers
Consultant: Akritas Consulting Engineers
Contract Amount: 29,900
Duration: 2008-2008

• EAC Stores Paphos
Architects: A.F Modinos + S A Vrahimis
Consultant: Soteriou Kyrizis Partners
Contract Amount: 267,908
Duration: 2006-2008

• Air Base A Papandreou- Paphos Airport
Architects: EMS
Consultant: EMS
Contract Amount: 244,212
Duration: 2007-2007

• Gymnasium at Polis Chrisochou
Architects: Hands
Consultant: G. Kokou Consultants
Contract Amount: 170,000
Duration: 2008-2009

• Aradippou High School
Architects: Yiannos Anastasiou Architect
Consultant: Mitsides, Samuel Partners
Contract Amount: 390,283
Duration: 2007-2008

• Larnaka International Airport Road Network
Architects: EMS
Consultant: EMS
Contract Amount: 388,672
Duration: 2006-2007

• Kofinou Roundabout
Architects: EMS
Consultant: EMS
Contract Amount: 387,124
Duration: 2007-2008

• Army Camp Aplanta
Architects: Xristoforos A Meletiou
Consultant: Soteriou, Kyrizis Partners
Contract Amount: 372,330
Duration: 2006-2009

• Weatherford
Architects: Mourouzides
Consultant: Akritas Consulting Engineers
Contract Amount: 250,802
Duration: 2007-2008

• B.O.C A Panagides
Architects: Filiastides and Solomou
Consultant: Akritas Consulting Engineers
Contract Amount: 90,733
Duration: 2001-2003

• My Mall – Limassol
Architects: George Th. Mavromatis and Associates
Consultant: Soteriou,Kyrizis Partners
Contract Amount: 3,417,202
Duration: 2008-2009

• Mercedes Larnaca
Architects: CMP Architects Conculting Engineers
Consultant: NSA NIKOLAIDES
Contract Amount: 85,430
Duration: 2007-2008

• G.C.O Stadium
Architects: Margarita Danou
Consultant: MELTEC
Contract Amount: 204,861
Duration: 2008-2009

• Limassol Port Roundabouts
Architects: P.W.D.
Consultant: Aspello Consulting
Contract Amount: 322,361
Duration: 2007-2008

• EAC 132KUA XLPE Cable Limassol
Architects: EAC
Consultant: EAC
Contract Amount: 276,793
Year of commencement: 2005
Year of completion: 2006 

• Stadium in Platres
Architects: K.Ioannides & Accosiates
Consultant: K.Ioannides & Accosiates
Contract Amount: 160,608
Year of commencement: 2006
Year of completion: 2007 

• Limassol Supreme Court-Parking
Architects: George Th. Mauromatis & Acossiates
Consultant: Soteriou Kyrizis Partners
Contract Amount: 105,513
Year of commencement: 2008
Year of completion: 2009 

• Limassol Paphos Highway – Evdimou
Architects: EMS
Consultant: EMS
Contract Amount: 105,475
Duration: 2005-2006

• Offices – Showroom Mercedes
Architects: CMP
Consultant: NSA Nicolaides & Associates
Contract Amount: 85,430
Duration: 2007-2008

• EAC S/S Agios Athanasios
Architects: EAC
Consultant: EAC
Contract Amount: 60,655
Year of commencement: 2006
Year of completion: 2007 

• Chapo Paralimni
Architects: N.Gavriel
Consultant: A.Eracleous ltd
Contract Amount: 88,088
Duration: 2007-2008

• Paralimni Square
Architects:
Consultant: Lakis Josefides & Associates
Contract Amount: 68,344
Duration: 2005-2006

• Tsokkos Offices in Paralimni
Consultant: Akritas Consulting Engineers
Contract Amount: 46,132
Duration: 2006-2007

• Luceum in Kokkinochoria
Architects: DAG Architects – Engineers
Consultant: Akritas Consulting Engineers
Contract Amount: 46,132
Duration: 2004-2005

• New families Quarters Raf Akrotiri
Architects: Gifford & Kalisperas
Consultant: Gifford & Kalisperas
Contract Amount: 666,354
Duration: 2002-2004

• EAC S/S Melizona
Architects: EAC
Consultant: EAC
Contract Amount: 164,430
Duration: 2003-2004

• Pathway at Protaras
Architects:
Consultant: L. Josiphides & Partners
Contract Amount: 112,768
Duration: 2000-2002

• Showroom Mercedes Benz Strovolos
Architects: CMP
Consultant: N.E Aristodemou LTD
Contract Amount: 207,627
Duration: 2009-2010

• Assinou School
Architects: Aristos Christodoulides
Consultant: CH. MELETIES
Contract Amount: 160,608
Duration: 2008-2009

• Galata school
Architects: J&A Philippou Architects Engineers
Consultant: J&A Philippou Architects Engineers
Contract Amount: 72,615
Duration: 2009-2010

• Hyperior
Architects: IRWIN + KRITIOTI Architecture
Consultant: Gemac
Contract Amount: 180.000
Duration: 2008-2009

• Laiki IT Centre Geri
Architects: CMP
Consultant: Meltec
Contract Amount: 781,753
Duration: 2007-2009

• Scala Theatre
Architects: Y. Demetriou Associates
Consultant: Acritas Consulting Engineers
Contract Amount: 276,793
Duration: 2008-2009

• EAC S/S Dekelia
Architects: EAC
Consultant: EAC
Contract Amount: 60,730
Duration: 2008-2008

• Agios Tychonas
Architects: PAP Architects
Consultant: Mecone
Contract Amount: 211,867
Duration: 2007-2009

• Anastasis Business Center
Architects: Akis Charalambous Partership
Consultant: Aspelo Consulting ltd
Contract Amount: 319,508
Duration: 2007-2008

• Geroskipou Square
Architects: Loukaides & Filippou architects
Consultant: Meltec
Contract Amount: 285,661
Duration: 2007-2009

Polis Station at Paphos
Architects: PWD
Consultant: SKP Soteriou, Kyrizis Partners
Contract Amount: 603,329
Duration: 2008-2010

• Army Camp Aplanta
Architects: Xristoforos A Meletiou
Consultant: Soteriou, Kyrizis Partners
Contract Amount: 372.33
Duration: 2006-2007

• Police Station – Famagusta
• Police Station – Paphos
• Archangel Monastery – Analiontas
Aelia Wellness Retreat
• Office Building at Makariou Avenue
• Winery at wintune Kalopanayiotis
• Eden nursing Home
• Larnaca General Hospital
• Unification of Archaeological Sites of Kato Paphos
• Pafilia-Germasogia Residence
• Prime Property – Residence
• BlueBerry Offices
• BlackBerry Offices
• Samirana Hotel
• Carolina Park-Rodafnousa Residence
• English School Extension & Renovation
• Pasydi Theatre
• Qatar Embassy
• Elderly People’s Homes
• Smalto Dental Clinic
• Eleftheria’s Square – Nicosia